Ceiling Elevation Changes in Storage Occupancies

Storage occupancies are handled separately within NFPA 13 for spacing, location, and calculation of fire sprinklers. These buildings may not have a smooth flat horizontal ceiling, especially when an existing building is being converted for use as a storage occupancy. A change in ceiling elevation could occur with a stepped ceiling or a sloped ceiling. This program will discuss the rules and their application for a storage area with a change in the elevation of the ceiling.

Approved for Contractor I, II and Waterbased Inspectors.

 

Each online class has a short quiz at the end of the video. Participants must pass the quiz prior to receiving their CEUs and certificate. Participants have FOUR opportunities to pass the quiz. If the quiz is not passed by the fourth attempt, the participant will be required to purchase the class again and pass the quiz to receive the CEUs and certificate.

 

Type: Archived
Running time: 90 min
CEUs: 1.5


Prices

Member: $50
Nonmember: $100
AHJ: $30

You must be logged in to purchase this seminar. Login

Don't have an account? Create one

 

Note: To obtain CEUs for online courses, you will be required to pass a brief quiz at the conclusion of the class.